Robotic manufacture halves production times for steel prefab bridges

Prefab bridge manufacturer, Mabey, is using robots to build parts of a modular steel bridge. The Gloucestershire based firm has invested £2.6 million in robotics, halving the manufacturing time for the company’s flagship C200 bridge’s panels and chords.

Read full original article »