CEO Willie Walsh said the incident occurred when an electrical engineer disconnected the uninterruptible power supply, therefore shutting down a data centre
CEO Willie Walsh said the incident occurred when an electrical engineer disconnected the uninterruptible power supply, therefore shutting down a data centre